Our process for estimation, in one place
For a while, the handling of estimation was improvised. Now there's a fixed order, and this post walks through it.
Context
A look back at how much time tasks really took, next to the original guess, remains the best way we know to improve, and it stays blame-free. The scope, not speed, should be our first lever if the deadline is fixed.
How We Do It
-
01
Split the Work First
A project gets split into pieces of no more than three days each before anyone puts a number on it; a piece that can't be split often hides an unknown that needs a short investigation first.
-
02
Give a Range
Each estimate is a range - a likely figure and the bad-week one - and the width of the range tells how much we still don't know yet.
-
03
Compare with What Happened
Once the work ships, the real time goes beside the estimate in the planning sheet; once a quarter the team looks at the gap between the two and adjusts the next ranges.
If no one can say how long something will be, a time-boxed experiment of a day or two gives an honest estimate cheaper than guessing.